Technical Support Package
Key elements of the TSP are assistance with:
- Existing fairing/coating system latent defect inspection and documentation
- Existing damage documentation on glass, teak, stainless etc.
- Corrosion areas inspection and documentation
- Hardware coating condition and bi-metallic corrosion inspection
- QC check on incoming paint and non paint materials for the project
- QC inspections and documentation at the start, during and end of each preparation stage
- Final acceptance/delivery assessment, including accumulation of measurable data in acordance with the contract delivery protocol
- Elaboration and sign-off of a project re-delivery protocol
- Liaison between shipyard/applicator and Owner's representative
Business Support Package
Key elements of Structure Implementations such as:
- SOP (Standard operational procedures)
- Paint and non-paint material selection
- Project cost calculations
- Work break-down structure project manpower allocation
- Acceptance and delivery standard
- OEM internal training program
- On-time delivery project task scheduling
- IPQA (Kaizen, Zero defects principle, 5S)
- Employee 6 step training program